CFA Piles

These piles are constructed by drilling with a continuous flight auger (CFA) to the required depth and injecting the concrete through the hollow stem of the auger during its extraction.
CFA piling is a cost-effective, reliable and efficient method of installing piles in the majority of ground conditions. It is suitable in unstable and saturated ground conditions, with minimal noise and vibration.